Where expertise meets innovation

View a snapshot of our projects from residential and retail to commercial and transport. We have included a brief synopsis of the structural principles and any particular challenges we have come across in each project. Contact us for more information on a particular project or to speak to us about our experience in a specific sector.

  • All
  • Residential
  • Commercial
  • Science & Research
  • Rail related projects
  • Hospitality
  • Mixed Use
  • Retail
  • Refurbishment & Re-engineering
  • The South West Lands project is a 900 unit residential led mixed use development at the 85-acre Wembley Park site. 

  • Longford House is an 8 storey, affordable housing block for British Land and forms part of their mixed-use development at Triton Square, Euston. 

  • This private rental residential scheme forms part of the W06 package which in turn forms part of the overall residential-led regeneration of the Wembley area.

  • The Hive building is a 160,000 sq/ft office at Wembley Park. It is one of two buildings developed simultaneously that comprise the W06 mixed use development. Both buildings sit on a retail podium with a courtyard space between the buildings.

  • Taylor House Completes!! Cre8 Structures were the structural engineer responsible for the design and delivery of Taylor House, a landmark residential development comprising two six-storey buildings, including a modern extra care block with 65 self-contained units and on-site parking and a separate residential building providing 22 family sized affordable general needs housing.

  • The social housing development at Westmead, Tavistock Road consists of a single block of 65 units and is situated on the site of a former Elderly care home now made redundant by the opening of a new, larger care home in the Ward.

  • The Balmoral Castle Project provides a minimum of 31 Community Supported Housing Flats to replace the existing Darwin House accommodation, as well as a mixture of 1,2 and 3 bedroom apartments on the site and was initiated following a petition received from the local community seeking redevelopment of the derelict Balmoral Castle pub.

  • The Woodridings Court project is a high quality social housing development within the existing Council owned Woodridings Court Estate in the London Borough of Haringey, comprising a 33 unit development in four blocks of 4-5 storeys.

  • Rockingham Street project is a development of student accommodation comprising a 23 storey tower on a constrained triangular site.

  • CRE8 Structures were selected as civil and structural engineers for a competition entry for a new innovation Campus next to St Thomas’ hospital grounds in Waterloo to provide innovation space for medtech start-ups.  

  • Regent’s Place is a 13 acre, managed estate in London’s West End under the ownership of British Land and is home to 10,000 workers and residents.

  • The Naval Row project is a 30 storey tower providing 16,000 sqm of build to rent accommodation in the heart of Blackwall, London.  

  • 10 Brock Street is an office development designed by WilkinsonEyre and HalcrowYolles for British Land. The distinctive 16 storey development occupies a key site fronting onto Euston Road and forms the centre piece of the regeneration of the Regent’s Place estate.

  • The Oast House project is a 350 unit multi-storey residential development for Spelthorne Borough Council which the council will retain and rent out. The project includes two towers up to 18 storeys and the refurbishment of a grade 2 listed Oast House to form a community theatre.

  • As part of the major station upgrade on the Great Western Route, Network Rail are developing extra capacity at Oxford station. The new Western entrance has a significant footprint that may allow air rights development about.

  • The VDC Car & Coach Park is designed to accommodate 290 coaches and 600 cars near Wembley Stadium on event days.

  • The Frederick Messer estate is a 66 unit residential development on the Frederick Messer Estate near Seven Sisters station in Haringey. The development consists of three six storey blocks fronting the seven sisters road.

  • 100 Bishopsgate is one of the latest additions to the skyline in the City of London, its steel frame rising above the busy streets.

  • London Designer Outlet Centre is the 70-store shopping centre next to Wembley Stadium.

  • The 505-511 Archway Rd is a residential project on the site of a carwash and car repair yard.

  • This building sits within the Hans Town conservation area in the Royal Borough of Kensington and Chelsea, in close proximity to Harrods, Knightsbridge.

  • The building is located to the south of Soho Square and was originally built circa 1770’s as a Hospital for Women.

  • The Bear Lane project is an eight storey commercial office development in Southwark. The site is on former Network Rail (NWR) owned land immediately adjacent to a brickwork viaduct carrying the main Thameslink railway line through central London.

  • The building is located to the west of the One Canada Square tower.

  • Buildings 3 and 4 are the latest offices on the Cambridge Innovation Park for what will become one of the UK’s greenest and most sustainable, low carbon business villages. 

  • The Royal Lancaster Hotel is located north of and close to Hyde Park and is adjacent to Lancaster Gate underground tube station.

  • The site is in an established residential area served by a number of bus routes, is 0.6 miles from Forest Hill national rail station and is bounded by Stanstead Rd, Brockley Rise and St Germans Rd.

  • The KWest hotel development is a planned refurbishment of the existing spa hotel in Shepherds Bush.

  • The Marshgate Lane project is a development of student accommodation for Alumno, and will provide 304 rooms, with the ground floor level providing communal space and a total of 225sqm of commercial space.

  • CRE8 Structures were selected as Civil and Structural Engineers for a due diligence evaluation of the western extension building to the Arm campus at Peterhouse.

  • CRE8 Structures are the retained structural engineers at 1 Canada Square, responsible for reviewing and assessing the structural implications of refurbishment works and modification, that are proposed by tenants, on the existing floor plates and structure.